The soil investigation report handed to the structural engineer for the design of pile Basis reason should really contain the embedment length on the piles, the advisable measurements on the pile, the Risk-free Performing load of every pile measurement, together with other information and facts Which might be needed for https://alfreds023edb2.wikimeglio.com/user