When the proposed subcontractor’s purchasing system has not been reviewed, the contractor shall be so suggested. (e) If the Contractor gets the Contracting Officer’s final dedication of material weaknesses, the Contractor shall, inside 45 days of receipt of the ultimate dedication, possibly proper the fabric weaknesses or submit an appropriate https://cpsr14814.bloggazzo.com/32830185/cpsr-for-dummies