Stem seal maintenance includes monitoring external leakage, adjusting packing gland compression if live-loading is not provided, and replacing packing materials when adjustments no longer control leakage, with maintenance intervals varying from months to years depending on valve design, operating frequency, and environmental exposure conditions. https://globalsealstech.com/product-category/oil-gas-seals/api-6d-ball-valve-and-lng-seals/