PIK2 commenced construction in 2016 based upon TOWNLAND’s renewed Learn System on this Beforehand swampy and low yielding agricultural land. This was accompanied by construction of the main ring highway network as the main spine of the Township’s circulation program and subsequently the canal procedure. To this point (mid-2021), PIK https://www.propanraya.com/propan-sandimas-experience-center-hadir-di-pik-2-tawarkan-inovasi-terbaik-untuk-solusi-cat-dan-pelapis